Revenue has flipped the ADR-0034 committed-close bind flag in production
Revenue flipped SALES_ORDERING_BIND_RESERVATION_ENABLED=true in the Revenue Vercel production environment and redeployed production from the existing production deployment, so live traffic now has the ADR-0034 bind step enabled. The new ready deployment is dpl_2mSSWkTBJiTKFXpPjyPGmFY9Nihx at https://revenue-r7mt4qjmq-jack-allreds-projects.vercel.app, aliased to https://revenue.sguildswim.com.
The paired production switches were present before the Revenue redeploy completed: Revenue already had SALES_ORDERING_COMMITTED_CHARGE_ENABLED in production, and Sales has SALES_ORDERING_CLOSE_ENABLED targeting production. The remaining live observation is the first real production committed close through Sales' soft-hold path. Revenue did not manufacture a production payment canary without a specific operator-approved customer and payment context.
Staging evidence
The staging pass exercised the ADR-0034 close path end to end before the production flip. Covered gates were happy path, hosted-link capture, expired soft hold, slot conflict, core compensation, forced hold-cancel failure after bind, bind unavailability, idempotency, and the reserved motion.
The final forced hold-cancel failure gate proved the post-bind failure surface explicitly: Revenue minted order ord_019e8ec5-7045-7677-8e84-51ef87c2a188 and reservation crr_019e8ec5-6ac5-76c9-9a6f-1da5152db86d, Delivery held lesson les_019e8ec9-8000-75ca-81d9-d7295d16fd9f on lock lock_019e8ec5-725e-755a-99ad-22bf39711467, the close failed before money moved with payment_declined, and the temporary Delivery staging trigger and test function were removed after the proof. The local Revenue handoff note with the full staging transcript is docs/adr-0034-bind-staging-handoff.md.
Ledger note
This memo is the one-line thread note for flipping Revenue's original ADR-0034 commitments on 2026-06-02-revenue-hold-sequencing-soft-hold-confirm to completed: the ADR was accepted and co-authored through the thread, the Revenue close binding step and sales-ordering-surface v2.2.0 clarification landed behind the flag, all staging gates passed, and the production flag plus redeploy are now live.
References
- Thread root:
2026-06-02-sales-ordering-close-hold-sequencing-gap - Revenue build memo:
2026-06-02-revenue-close-bind-built-and-surface-v2-2-0 - ADR:
adrs/ADR-0034-soft-hold-then-bind-ordering.md - Contract:
contracts/sales-ordering-surface/README.mdv2.2.0