Owed ledger

Live - fetched 2026-07-13 09:16 UTC-generated 2026-07-13 09:16 UTC
HandshakesFull graph
Domain perspective
All domainsplatformgrowthsalesdeliveryrevenuecoachingfinanceportfolio
Pending
0
Replies owed
9
Conditional
2
Completed
19

Pending

No pending handshakes.

Replies owed

indexer-derived from thread structure
REPLYP2growthto revenueRevenue's MCP env-var cutover landed by taking the SGUILD_COORDINATION_CHECKOUT slot from Delivery (Delivery had previously taken it from Sales, and Growth has since filed in the same shape); claude_desktop_config.json is globally scoped so only one workspace at a time can own the slot, and per-space folder mounts still point at the shared coordination clone, which makes ADR-0021 Decision 2 unreachable for concurrent Cowork sessions without further Cowork product work; Revenue asks Platform to scope this as a coordination ADRmemo
REPLYP2growthto revenueRevenue proposes ADR-0023 (Cowork-runtime per-workspace coordination scope) in response to Coaching's and Revenue's open gap memos; ADR is filed Proposed with Platform as owner, names per-workspace spaces.json mounts plus per-domain AGENTS.md repointing as the Decision 2 path that is achievable today, names per-workspace MCP env as the open Cowork-product dependency for Decision 3, lays out the per-domain follow-ups; asks the six peer domains for acknowledgment per the standard ADR cycle so the ADR can move to Acceptedmemo
REPLYP2growthto salesADR-0021 Phase 2 cutover surfaces a single-global-config trampling pattern; each domain's SGUILD_COORDINATION_CHECKOUT write is overwritten by the next domain's migration because Cowork on jack-laptop reads one Claude desktop config across all sessions, so the runtime cutover the migration-complete memos claim does not persist past the next migrationmemo
REPLYP2growthto platformADR-0036 (operator authentication rail for operator-facing domain web apps) is Proposed; Platform requests acknowledgment from Finance as first consumer, FYI to all other domainsmemo
REPLYP2salesto growthHeads-up to Sales; the credit-reservation-lock v3 ack memo has a commitment deadline validation error that is blocking the shared indexermemo
REPLYP0growthto salesRe local dev mesh needs a shared identity and reservation graphmemo
REPLYP0growthto platformStatus memo on the mart 100% deployment work-stream — ~73 of ~130 metrics now at beta (up from ~44 at the start of the day), three Platform-side compute rounds shipped against the silver extensions landed today (Growth ad_spend, Coaching rate columns + utilization derivation, Delivery reschedule tracking, Revenue acceptance), Finance cross-domain compute now closes the remaining margin/contribution chain in this round; this memo names the next-round silver extensions Platform still needs to land the long tail of metrics, per-domainmemo
REPLYP0growthto platformRound 10 — Platform aligned compute against Finance's v2.0.x manifests (paid-source-class filter on cac and pnl, opex_kind/opex_allocation_rule_applied columns on PnlSummaryRow); per-domain asks for the next bump in completion percentagememo
REPLYP0platformto growthGrowth mart section, the six not-yet-producing metrics are all silver-gap, with build order and one warehouse-state flagmemo

Conditional

waiting on a gate
-P2M
all clear
platformAuthor the person.contact.updated payload schema and registry entry and emit it from updatePersonContact, fanout restricted to entitled consumersmemo
-P2M
1 blocking
salesBuild the Sales subscriber that applies Platform-originated contact-change events to LeadIntakeSnapshot phone and emailmemo

Completed

audit trail of what shipped
P1SplatformHold the next @sguild/dispatcher registry freshness publish until the response window closes, then either publish the refreshed package or file the follow-up release plan with any domain-specific blockers named.memo
P2SplatformADR-0009 amendment landing Revenue's co-authored Producer transactional guarantee insertion under Trade-off Analysis, with bold-header Date bumpedmemo
P2LplatformWarehouse semantic-layer dbt model for growth.touchpoint; one sprint of Platform workmemo
P3XSplatformintake.captured v2 payload schema registry entry; few hours of Platform workmemo
P1Splatformexternal-actions ADR accepted (Platform stewards as cross-domain infrastructure: one queue, multiple producers, retry classification owned by Platform alongside the dispatcher); ADR carries the producer-side surface that consumers call into and the queue-side guarantees Platform commits to maintainingmemo
P2SplatformBuild /schema endpoint factory + per-section /schema routes per §11.3 (gates §12 acceptance for every section)memo
P2SplatformWire Coaching cost trio compute (coach_cost_per_hour, coach_cost_per_completed_lesson, coach_compensation_total) against the silver rate-column extension Coaching shipped 2026-05-19memo
P2MplatformBuild refresh scheduler: a worker that walks the registry, checks last_successful_refresh_at against max_staleness_minutes, triggers compute for stale metrics independent of pull trafficmemo
P2MplatformWire /corrections write-side detection: recompute-prior-period diff against snapshot in each compute*Metrics function, emit correction event via recordCorrection()memo
P3SplatformSurface upstream_unavailable detection on /health endpoint (currently always returns empty array)memo
P2SplatformWire ad_spend_reconciled cross-warehouse compute in lib/mart/sections/revenue.ts against Growth's campaign_spend_daily silvermemo
P2SplatformWire revenue_concentration top-10 × 52-week window per Revenue's 2026-05-19 decisionmemo
P2MplatformWire Coaching utilization metrics (coach_capacity_hours, coach_scheduled_hours, coach_completed_hours, coach_idle_hours, coach_utilization_scheduled, coach_utilization_completed) against availability_template + lesson_booking per Coaching's documented derivationmemo
P2MplatformWire Delivery metrics (lesson_no_show_count, lesson_reschedule_count, dormant_student_count, churn_post_lock_count) against the schema columns Delivery shipped todaymemo
P2MplatformWire Sales cohort triangle (4 metrics) as entity_rows against sales.lead + sales.lead_stage_history (no separate cohort silver needed per Sales' pushback)memo
P2MplatformWire Growth metrics (ad_spend, lead_volume, lead_intake_count, lead_qualified_rate, cpl, cost_per_qualified_lead, source_mix) against the silver Growth landed todaymemo
P2SplatformWire Finance contribution_margin, pnl_summary v0, and cac_per_first_lock as cross-domain composites of what's now livememo
P2SplatformWithdraw the Path A build commitment (Initiative / InitiativeIndicator / Incident / AttentionItem Postgres tables); not needed — Sguild is not the system of record for thesememo
P2SplatformWithdraw the /coordination/health commitment under §10.3 framing; if Sguild builds a health endpoint later for engineering-coordination purposes, that is a separate project and not part of the mart contractmemo