Owed ledger

Live - fetched 2026-09-15 11:47 UTC-generated 2026-09-15 11:47 UTC
HandshakesFull graph
Domain perspective
All domainsplatformgrowthsalesdeliveryrevenuecoachingfinanceportfolio
Pending
1
Replies owed
1
Conditional
1
Completed
21

Pending

platform (1)
-P2MplatformAuthor the person.contact.updated payload schema and registry entry and emit it from updatePersonContact, fanout restricted to entitled consumersmemo

Replies owed

indexer-derived from thread structure
REPLYP2salesto growthHeads-up to Sales; the credit-reservation-lock v3 ack memo has a commitment deadline validation error that is blocking the shared indexermemo

Conditional

waiting on a gate
-P2M
1 blocking
salesBuild the Sales subscriber that applies Platform-originated contact-change events to LeadIntakeSnapshot phone and emailmemo

Completed

audit trail of what shipped
P1SplatformHold the next @sguild/dispatcher registry freshness publish until the response window closes, then either publish the refreshed package or file the follow-up release plan with any domain-specific blockers named.memo
P2SplatformADR-0009 amendment landing Revenue's co-authored Producer transactional guarantee insertion under Trade-off Analysis, with bold-header Date bumpedmemo
P2LplatformWarehouse semantic-layer dbt model for growth.touchpoint; one sprint of Platform workmemo
P3XSplatformintake.captured v2 payload schema registry entry; few hours of Platform workmemo
P1Splatformexternal-actions ADR accepted (Platform stewards as cross-domain infrastructure: one queue, multiple producers, retry classification owned by Platform alongside the dispatcher); ADR carries the producer-side surface that consumers call into and the queue-side guarantees Platform commits to maintainingmemo
P2SplatformBuild /schema endpoint factory + per-section /schema routes per §11.3 (gates §12 acceptance for every section)memo
P2SplatformWire Coaching cost trio compute (coach_cost_per_hour, coach_cost_per_completed_lesson, coach_compensation_total) against the silver rate-column extension Coaching shipped 2026-05-19memo
P2MplatformBuild refresh scheduler: a worker that walks the registry, checks last_successful_refresh_at against max_staleness_minutes, triggers compute for stale metrics independent of pull trafficmemo
P2MplatformWire /corrections write-side detection: recompute-prior-period diff against snapshot in each compute*Metrics function, emit correction event via recordCorrection()memo
P3SplatformSurface upstream_unavailable detection on /health endpoint (currently always returns empty array)memo
P2SplatformWire ad_spend_reconciled cross-warehouse compute in lib/mart/sections/revenue.ts against Growth's campaign_spend_daily silvermemo
P2SplatformWire revenue_concentration top-10 × 52-week window per Revenue's 2026-05-19 decisionmemo
P2MplatformWire Coaching utilization metrics (coach_capacity_hours, coach_scheduled_hours, coach_completed_hours, coach_idle_hours, coach_utilization_scheduled, coach_utilization_completed) against availability_template + lesson_booking per Coaching's documented derivationmemo
P2MplatformWire Delivery metrics (lesson_no_show_count, lesson_reschedule_count, dormant_student_count, churn_post_lock_count) against the schema columns Delivery shipped todaymemo
P2MplatformWire Sales cohort triangle (4 metrics) as entity_rows against sales.lead + sales.lead_stage_history (no separate cohort silver needed per Sales' pushback)memo
P2MplatformWire Growth metrics (ad_spend, lead_volume, lead_intake_count, lead_qualified_rate, cpl, cost_per_qualified_lead, source_mix) against the silver Growth landed todaymemo
P2SplatformWire Finance contribution_margin, pnl_summary v0, and cac_per_first_lock as cross-domain composites of what's now livememo
P2SplatformWithdraw the Path A build commitment (Initiative / InitiativeIndicator / Incident / AttentionItem Postgres tables); not needed — Sguild is not the system of record for thesememo
P2SplatformWithdraw the /coordination/health commitment under §10.3 framing; if Sguild builds a health endpoint later for engineering-coordination purposes, that is a separate project and not part of the mart contractmemo
P1SgrowthDeploy the Growth lead.intake.renewed migration and consumer through the gated production rollout, run the live health check, and publish zero-mismatch lag evidence before Sales enables renewed routingmemo
P1SgrowthDeploy the Growth schema migration, seed the verified Meta form mappings, enable intake.captured v3, and run the mapped Meta canary and post-deploy auditmemo