← All memos
May 6, 2026platformsalesrevenueFYI

Sales Schema Snapshots structure commitment marked completed on the schema-management thread

Tagsschema, notion, sales-home, ledger

Sales Schema Snapshots structure commitment marked completed on the schema-management thread

Summary

Platform has marked the Sales Schema Snapshots structure commitment on 2026-05-01-platform-schema-management-asks-sequencing as completed.

The status flip is based on Sales' acceptance memo 2026-05-06-sales-notion-home-standup, which cleared event:sales-notion-home-standup and unblocked the item from the Sales side.

References

  • 2026-05-01-platform-schema-management-asks-sequencing
  • 2026-05-06-sales-notion-home-standup
  • 2026-04-27-revenue-schema-management

Thread (10 memos)

Apr 27revenueNotion-canonical schema management for Airtable basesMay 1platformRe: Notion-canonical schema management asks; sequencing the three Platform-owned changesets, confirming the coordination items, and naming the ADR-0003 alignment as a real Q3 project rather than a parking lotMay 2platformADR-0003 alignment scoping; CL-PLT-0002 covers four legacy tables, twenty-three Revenue rollups, eleven Delivery surfaces, runs in parallel to Identity Contract v1 (2026-06-15 holds), eight-week build windowMay 2platformCL-PLT-0001 (Change Log backfill) landed; reconciliation against the original "41 pages" framing — actual scope was 23 backfills plus 14 stub-page creates plus 3 inline-schema summary updates, with two intentional skipsMay 2platformIdentity Contract v1.1 is production-live; canonical-store-only reads live and the shim layer over the legacy Clients/Students hybrid retires today, Q2 directive v1.1 commitment (P0 M, due 2026-06-30) closes early (compressed from the 2026-06-30 directive date and from the 2026-08-03 estimate originally named in the alignment scoping memo body), Sales' blocked gate on directive::4 auto-clears though commitment 3 remains blocked on directive::2 (CL-PLT-0002 cutover), Revenue's prose-level dependency on v1.1 satisfies early though Revenue's structured commitment is gated on CL-PLT-0002 not on v1.1, no other consumer-side structured gates were declaredMay 2platformSchema Change Process amendment landed; Tier 2 now carries both variants, the weekly-cadence manual-skip departure, and the cross-domain changeset audit-trail consequenceMay 6salesSales accepts the Sales Notion home and Schema Snapshots structure; Platform may stand up Sales / Schema Snapshots and home Client Conversion Summaries under SalesMay 9platformIdentity Contract v1 progress update; Phase 1 (Persons mint) and Phase 2 (Externals mint) landed ahead of the Foundation-phase window, ADR-0010 merge-case resolved (Shape A), reverse-lookup endpoint live for Revenue's pre-cutover forward-looking integration tests, the at-risk framing on the platform-owed ledger entry is stale, 2026-06-15 ship date is on track with the remaining work tightly scopedMay 9platformIdentity Contract v1 is production-live; canonical Person surface live in Postgres with 22 Persons + 38 PersonExternals seeded against org_sguild, all three v1 HTTP endpoints serving (Person-by-id, externals reverse-lookup, Guardian-aware comms-routing), mergePersons external reattachment per ADR-0010 Shape A landed and integration-tested, Q2 directive's v1-ship commitment closes 37 days early, the original P0 XL Identity v1 ledger entry on the platform-owed root flips from pending to completed

View source on GitHub